KSLU Corner™ New AIBE previous QP

Environmental impact assessment and the Coastal Regulation Zone

Environmental Law · Unit V · Topic 16 of 18 · 7 min read

EIA as prevention, the discretionary model before 1994 and the mandatory model of the 1994 and 2006 notifications, the four stages under EIA 2006, ex post facto clearance from Alembic to Vanashakti, and the CRZ notifications of 1991, 2011 and 2019 with their classification, Jagannath and Maradu.

On this page
  1. 1. Meaning and purpose of EIA
  2. 2. The discretionary model (before 1994)
  3. 3. The mandatory model: 1994 and 2006
  4. 4. Courts on EIA
  5. 5. The Coastal Regulation Zone
  6. 6. CRZ cases
  7. How this is examined
Cases checked to exist. Read the judgment before quoting a holding.

Every case cited here has been checked to exist — the citation resolves and names the right parties. The propositions attributed to each case have not been verified line by line against the judgment. Case names link through to the full judgment: read it before quoting a holding in an examination answer, and never carry a proposition from notes into court on trust.

The examinable core. “Prevention is better than cure” (January 2026) is the idea behind EIA: study the harm before the project is approved. February 2025 asked for the two models: the discretionary model (administrative guidelines, 1978–1994) and the mandatory model (statutory notifications of 1994 and 2006 under the 1986 Act). For CRZ, learn the four categories of the 2019 notification.

1. Meaning and purpose of EIA

Environmental impact assessment is a process for identifying, predicting and evaluating the likely environmental and social effects of a proposed project before a decision is taken on it, and for designing measures to avoid or reduce them. It puts the precautionary principle into procedure, gives affected people a hearing, and forces the developer to consider alternatives. Rio Principle 17 calls for EIA of activities likely to have a significant adverse impact, and the ICJ in Pulp Mills (2010) treated it as a requirement of general international law for projects with transboundary risk.

2. The discretionary model (before 1994)

EIA in India began in 1978–79 with the appraisal of river valley projects by the Department of Science and Technology, later the Department and then Ministry of Environment. Projects needing Central approval or Planning Commission funding were asked to obtain environmental clearance under administrative guidelines. There was no statutory duty, no public hearing, no fixed list of projects and no sanction for non-compliance; clearance was often given after the project had started. That is why it is called discretionary.

3. The mandatory model: 1994 and 2006

On 27 January 1994 the Central Government issued the first EIA notification under section 3 of the Environment (Protection) Act, 1986 and rule 5 of the 1986 Rules. Prior environmental clearance became compulsory for listed categories of projects; public hearings were added in 1997. The 1994 notification was replaced by the EIA Notification, 2006 (S.O. 1533(E), 14 September 2006), which is still in force with many amendments.

4. Courts on EIA

5. The Coastal Regulation Zone

The coast is protected by notifications under section 3(1) and 3(2)(v) of the 1986 Act, which allow the Centre to restrict industries and activities in specified areas. The first CRZ Notification was issued on 19 February 1991. It was replaced in 2011 and again by the CRZ Notification, 2019. The coastal stretches of seas, bays, estuaries, creeks, rivers and backwaters influenced by tidal action, up to 500 metres from the High Tide Line on the landward side, and the water area up to 12 nautical miles, are regulated. Plans are prepared and enforced through the Coastal Zone Management Plans and the National and State Coastal Zone Management Authorities.

Classification under the 2019 notification (January 2026 asked for it):

The 2019 notification also created a No Development Zone of 20 metres for all islands near the mainland and in backwaters, and treats certain areas (Sundarbans, Gulf of Kutch, Gulf of Mannar, Malvan and others) as Critically Vulnerable Coastal Areas.

6. CRZ cases

How this is examined

January 2026: CRZ classification (6) or EIA as prevention (6). February 2025: the two models of EIA (10). August 2024: a note on EIA. For the models question, set the discretionary and mandatory phases side by side in prose: legal basis, coverage, public participation and sanction. End with Alembic and the current position on ex post facto clearance.

Now try the real questions: Environmental Law past question papers.